Case: Quarter Strip Timing Error

Using a quarterly strip against a front-loaded physical schedule created timing mismatch and reduced hedge precision.

Key Takeaways

  • Tenor alignment matters as much as direction.
  • Schedule assumptions must reflect physical flow timing.
  • Layered hedging can reduce timing-induced slippage.

References

Last reviewed: 2026-03-21