Case: TCE Spread Hedge Error
A hedge built on WS-level intuition underperformed because route-level cost assumptions diverged from realized execution.
Key Takeaways
- TCE normalization is mandatory for cross-route hedging.
- Model assumptions need ongoing calibration against fixtures.
- Execution quality materially affects hedge outcomes.
References
Last reviewed: 2026-03-21